Dresano territory is affected by around 1 km of TEEM motorway-grade route. In this area, the infrastructure will be slightly raised, around 2 m above ground level.

The “Dresano alternative route to the Strada Provinciale 159 from Strada Provinciale 138 up to the Dresano roundabout” (near the “La Pimpi” farm) will also be built in this municipality. The new route will reduce the flow of vehicles congesting the in-town stretch of the SP 159 by separating local traffic from vehicles in transit. The stretch of road that is to be built to the east of the Dresano built-up area will be around 1.5 km-long, featuring an overpass over the road to Cascina Belpensiero and links to the existing road network via new roundabouts.

The 1mm scale interval map will be implemented for the “Cavo Marocco–Cologno” Special Environmental Project, including major works to protect the functionality of the irrigated grid in the area used for farmland, along with the planting of new woodland.

 

PROGETTO AUTOSTRADALE E OPERE CONNESSE

LOTTO C

ESPROPRI

DICHIARAZIONE PUBBLICA UTILITÀ – 07.02.2011

[wpfilebase tag=browser id=476 /]

INTEGRAZIONE DICHIARAZIONE PUBBLICA UTILITÀ – 27.07.2012

[wpfilebase tag=browser id=340 /]